Wallumbilla Vent Lines

This project required detailed planning from start to finish. Communication was key for this one to get over the line successfully. Quality Process Services were responsible for:

  • Development of 10 weld procedures to ASME and Australian standards.

  • Procurement of all fabrication materials including pipe, fittings, studs, gaskets.

  • Workshop fabrication of 2 x DN400 vent lines & 1 x DN150 vent line.

  • Non-destructive testing of all welds.

  • Workshop hydro-testing of completed spools.

  • 2 coat system applied to all spools.

  • Fabrication of structural support components.

  • Transportation of all materials to site.

  • Removal of existing vent line.

  • All civil works required - included 3 metre piers with caps.

  • Full site installation of vent lines and stacks, including field welding, NDT, hydro-testing, drying, coating.

  • Guy rope installation.

  • Dual lift for vent stack installation.

  • Structural support installation, including grouting.

  • Full MDR documentation package.